Volume 40 - Issue 34 - August 26, 2021
State of Kansas
Department of Transportation
Notice to Contractors
Electronic copies of the letting proposals and plans are available on the Kansas Department of Transportation (KDOT) website at https://kdotapp.ksdot.org/Proposal/Proposal.aspx. The website will allow the contractor to request approval from KDOT to bid as a prime contractor and be included on the “Bid Holders List,” or to be included on the “Non-Bid Holders List” as a subcontractor/supplier. KDOT’s approval is required to bid as a prime contractor. To bid as a prime contractor, KDOT needs to be notified of the intent to bid no later than the close of business on the Monday preceding the scheduled letting date. Failure to obtain prior approval to bid as a prime contractor on any projects listed below will be reason to reject your bid. The Secretary reserves the right to reject bids that do not comply with all requirements for preparing a bidding proposal as specified in the 2015 edition of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction.
KDOT will only accept electronic internet proposals using the Bid Express website at http://www.bidx.com until 1:00 p.m. (CST) September 22, 2021. The KDOT bid letting will be conducted remotely by audio broadcast ONLY at 3:00 p.m. (CST) Wednesday, September 22, 2021. To join the conference call, dial 866-620-7326 and enter conference code 5895748207. KDOT has tested the process, but in the event of an unforeseen issue, KDOT will provide updates.
Each bidder shall certify that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. This certification shall be in the form of a required contract provision provided by the state to each prospective bidder. Failure to complete the required contract provision and certify the completeness of the preceding statement when electronically signing the proposal will make the bid nonresponsive and not eligible for award consideration.
District One – Northeast
Jackson – 75-43 KA-5710-01 – US-75, at the 190th Road intersection located approximately 3.6 miles north of Mayetta, intersection improvement. (Federal Funds)
Wyandotte – 70-105 KA-4744-05 – I-70, from 1.4 miles east of the Wyandotte/Leavenworth County line east to the Wyandotte County/Missouri state line, signing, 15.8 miles. (Federal Funds)
Wyandotte – 435-105 KA-6368-01 – I-435, 22 bridges from the Kansas River bridge to the Wolcott Drive/Union Pacific Railroad bridge, bridge deck patching, 10.3 miles. (State Funds)
Statewide – 106 KA-6092-01 – K-130, US-50, US-56, K-78, K-99 and K-170 in Lyon, Chase, Wabaunsee, Osage, and Greenwood counties, signing. (Federal Funds)
Statewide – 106 KA-6291-01 – Various locations in KDOT’s District 1 in Nemaha, Marshall, Doniphan, Johnson, Jefferson, Leavenworth, Lyon, Osage, Wabaunsee, Pottawatomie, and Wyandotte counties, milling, 0.5 mile. (State Funds)
District Two – North Central
Chase – 177-9 KA-6216-01 – K-177, from the Butler/Chase County line north to the Chase/Morris County line, sealing, 33.1 miles. (State Funds)
Cloud – 81-15 KA-6195-01 – US-81, from 5.1 miles north of the Cloud/Ottawa County line north 11.5 miles (to just south of the south city limits of Concordia), milling and overlay, 11.5 miles. (Federal Funds)
Cloud – 81-15 KA-6219-01 – US-81, from the north city limits of Concordia north 2.4 miles, pavement patching, 2.4 miles. (Federal Funds)
Geary – 244-31 KA-6252-01 – K-244, from the K-244/RS270 junction east to the K-244/K-57 junction, special, 3.9 miles. (State Funds)
Jewell – 28-45 KA-6217-01 – K-28, from the K-14/K-28 junction east to the K-148/K-28 junction, sealing, 6.1 miles. (State Funds)
Mitchell – 24-62 KA-6218-01 – US-24, from the Osborne/Mitchell County line east to the Mitchell/Cloud County line, sealing, 32.8 miles. (State Funds)
Morris – 64 KA-6221-01 – K-177, from the north city limits of Council Grove north to the K-177/L Avenue intersection and US-56, from the east city limits of Council Grove east to the Morris/Lyon County line, overlay, 11.3 miles. (Federal Funds)
Republic – 81-79 KA-5108-02 – US-81, various locations in Republic County, guard fence, 19.9 miles. (Federal Funds)
Saline – 85 KA-6222-01 – K-4, from the north junction I-135/K-4 north to the south city limits of Gypsum and K-104, from the K-4/K-104 junction north to the I-135/K-104 junction, milling and overlay, 15.5 miles. (Federal Funds)
Washington – 36-101 KA-6277-01 – US-36, from the US-36/K-22 junction east to the west city limits of Washington, special, 13.2 miles. (State Funds)
Statewide – 148-106 KA-6380-01 – K-148, from the K-148/K-28 junction east to the Jewell/Republic County line and from the Jewell/Republic County line north and east to the US-81/K-148 junction, sealing, 22.5 miles. (State Funds)
District Three – Northwest
Ellis – 26 C-5035-01 – 230th Avenue, from I-70 to Feedlot Road and Feedlot Road from 230th Avenue to US-183, grading and surfacing, 4.0 miles. (Federal Funds)
Logan – 40-55 KA-6209-01 – US-40, from the Wallace/Logan County line east to 0.1 mile east of the east K-25/US-40 junction, milling and overlay, 25.9 miles. (Federal Funds)
Statewide – 106 KA-6107-01 – US-183, US-24, K-258 and K-18 in Rooks, Graham, Osborne, Russell, and Phillips counties, signing. (Federal Funds)
District Four – Southeast
Cherokee – 166-11 KA-1005-02 – US-166/US-400, from 0.9 mile north of the US-166/US-400 junction, east and southeast to 0.5 mile northwest of the Kansas/Missouri state line, grading, bridge and surfacing, 6.1 miles. (Federal Funds)
Coffey – 16 TE-0446-02 – Ogden Street, from 3rd Street to 4th Street and Broadway Street from Ogden Street to Elm Street (excluding areas completed in Phase 1) in Lebo, landscaping and beautification, 0.2 mile. (Federal Funds)
Linn – 54 TE-0479-02 – Cedar Street, from 10th Street to 6th Street, 6th Street from Cedar Street to Main Street, Locust Street from 13th Street to 12th Street, Linn Street from 12th Street to 10th Street in Pleasanton, pedestrian and bicycle paths, 0.8 mile. (Federal Funds)
Miami – 61 C-5047-01 – Hedge Lane over the Burlington Northern Sant Fe railroad, located 8.8 miles south and 1.3 miles east of Paola, grading and surfacing, 0.1 mile. (Federal Funds)
District Five – South Central
Butler – 54-8 KA-6348-01 – Pavement markings on US-54, pavement marking, 0.3 mile. (Federal Funds)
Harvey – 135-40 KA-6347-01 – Pavement markings on I-135, pavement marking, 20.8 miles. (Federal Funds)
Kingman – 48 C-5043-01 – Bridge over the Chikaskia River on S.E. 70th Avenue, located 1.4 miles south and 0.5 mile west of Adams, bridge replacement, 0.1 mile. (Federal Funds)
Pawnee – 73 KA-6227-01 – K-156, from the Hodgeman/Pawnee county line east to the west city limits of Larned; K-264, from the Larned State Hospital north to the K-156/K-264 junction; and US-183, from the K-156/US-183 junction north to the Pawnee/Rush County line, milling and overlay, 37.4 miles. (State Funds)
Reno – 78 TE-0457-01 – Washington Street, from N. 17th Avenue to N. 23rd Avenue in Hutchinson, pedestrian and bicycle paths, 0.5 mile. (Federal Funds)
Sedgwick – 87 KA-6349-01 – Pavement markings on multiple routes including I-135, US-81 and US-54, pavement marking, 13.8 miles. (Federal Funds)
Sedgwick – 87 N-0678-01 – Woodlawn Street, from 37th Street through the 45th Street intersection in Bel Aire, grading and surfacing, 1.0 mile. (Federal Funds)
Sumner – 53-96 KA-6225-01 – K-53, from the east city limits of Mulvane to the K-53/K-15 junction, milling and overlay, 0.2 mile. (Federal Funds)
Sumner – 177-96 KA-6226-01 – US-177, from the Oklahoma/Kansas state line north to the US-177/US-81 junction, milling and overlay, 3.5 miles. (Federal Funds)
District Six – Southwest
Clark – 283-13 KA-6228-01 – US-283, from the north US-283/US-160 junction north to the US-54/US-283 junction, sealing, 11.5 miles. (Federal Funds)
Clark – 160-13 KA-6253-01 – US-160, from the south US-283/US-160 junction east to the west city limits of Ashland, sealing, 11.0 miles. (State Funds)
Clark – 160-13 KA-6286-01 – US-160, from the west city limits of Ashland east to the Clark/Comanche County line, crack repair, 13.2 miles. (State Funds)
Ford – 29 KA-6344-01 – US-56, from approximately 0.5 mile east of the east city limits of Dodge City east to the south US-50B/US-56/US-283/US-50 junction; and US-50, from the Old US-400/Old US-50B/US-50 junction north and east to 0.2 mile east of the US-283/US-50 junction (excluding portion through the city limits of Dodge City), crack repair, 10.7 miles. (State Funds)
Statewide – 106 C-5034-01 – Gray, Clark, and Meade counties, bridge replacement, 1.0 mile. (Federal Funds)
Statewide – 106 KA-6093-01 – US-400, US-283, US-50 and US-56 in Ford, Clark, Gray, Hodgman, Edwards, and Kiowa counties, signing. (Federal Funds)
Statewide – 283-106 KA-6341-01 – US-283, from the K-156/US-283 junction north to the Hodgeman/Ness County line and from the Hodgeman/Ness County line north to the south city limits of Ness City, crack repair, 24.7 miles. (State Funds)
Statewide – 190-106 KA-6351-01 – K-190, from the US-160/K-190 junction southeast to the Grant/Haskell County line and from the Grant/Haskell County line southeast to the US-56/K-190 junction, sealing, 12.3 miles. (State Funds)
Julie Lorenz
Secretary
Doc. No. 049361